Load Calculation Data and Procedures
ASHRAE Technical Committee 4.1



Agenda

Tip: Upload Your Agenda documents to the /documents/agenda/ directory and it will show up here automatically.

TC41 Agenda Kansas City

Upcoming TC Meetings

Tip: Copy and Paste Your Upcoming Meeting Information in this area.

Location: Kansas City, MO 
Sunday June 23, 2019 Room
8:00 AM - 9:00 AM - RP-1729 PMS KCCC 2213
3:00 PM - 4:00 PM - Handbook KCCC 2102B
4:00 PM - 5:00 PM - Research KCCC 2102B
5:00 PM - 6:00 PM - Programs KCCC 2102B
6:00 PM - 7:00 PM - Standards KCCC 2102B
Monday June 24, 2019  
2:15 PM - 4:15 PM - Full Committee Lester Young A (Marriott W, 3rd Flr)

Minutes

Tip: Upload your Minutes documents to /documents/meeting-information/ directory for them to show up here. The file names must include minutes as in "TC0709 draft Minutes Atlanta 20150628.pdf".

Committee Chair

Tip: This section automatically generated from site Configuration file.

Suzanne LeViseur TC0401@ashrae.net

Committee Scope

Tip: This section automatically generated from site Configuration file.

TC 4.1 is concerned with the identification and compilation of engineering data and the development of procedures for calculating heating, cooling, refrigeration and ventilating loads of structures.

icon

Upcoming Society Conferences

2020 Winter Conference
Feb 1-5, 2020
Orlando, FL

down-arrow

Conference Badges

Tip: You can put any type of content in the following section.

Additional Information

Committee Structure.  TC 4.1 is comprised of the full committee and four subcommittees:

  • Handbook - Writes and maintains the load estimating chapters in the ASHRAE Handbook - Fundamentals.
  • Research - Manages research projects related to load estimating.
  • Program - Develops and sponsors symposia, seminars and forums at ASHRAE semi-annual meetings.
  • Standards - Develops and maintains standards related to load estimating.

Subcommittee meetings are held Sunday afternoon during the semi-annual meetings.   Much of the discussion occurs at the subcommittee meetings.   Prospective members are encouraged to attend the subcommittee meetings as well as the full committee meeting.